Skip to main content

Scheduling the Integration Job

Normally, you would want to schedule the integration job so that a full reload from the ERP system is processed at predefined intervals (each job).

Access this setting by following the path: System Administration > Processing Services > JOB OPTIONS > Job Schedules.

job_schedules

Specify the scheduling parameters:

integration_scheduling_parameters

Next step:Customising the Data Integration Adapter

Was this article helpful?

We're sorry to hear that.